Oct. 6th, 2014

So close...

Oct. 6th, 2014 07:57 pm
pegkerr: (But this is terrible!)
This was supposed to be the last week of bathroom repair and then I was going to have my lovely new bathroom back. My BATHTUB back.

Today, the chap came in who was going to re-enamel the tub. They hooked up the drain and ran water through it for the first time in a month--and the water promptly leaked out of the piping around the drain and from there poured through the kitchen ceiling down below.

We are still trying to reach a plumber who can fix the problem for us.

Nooooooooooo!!!!

Profile

pegkerr: (Default)
pegkerr

April 2019

S M T W T F S
 123456
7 8910111213
141516171819 20
21222324252627
282930    

Peg Kerr, Author

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags