Going back to full time work
May. 19th, 2003 10:37 pmRob and I had our usual Monday night money meeting. We looked at income and outgoing expenses, including having to come up with deposits for summer camp, summer programs, and daycare being more than twice as expensive per week when school lets out. Estimate to repair/replace the tile and grout on the tub, replace damaged drywall, etc.: $650.00.
Damn. I was really hoping to avoid it, but there's just no way around it.
I'm going back to work full time next week. Losing my morning writing time.
This is really depressing.
Peg
P.S. I'll be at Wiscon. If you're there, look me up! Schedule includes panels on online journals and blogs, balancing writing with the day job (groan), and on being a slow writer.
Damn. I was really hoping to avoid it, but there's just no way around it.
I'm going back to work full time next week. Losing my morning writing time.
This is really depressing.
Peg
P.S. I'll be at Wiscon. If you're there, look me up! Schedule includes panels on online journals and blogs, balancing writing with the day job (groan), and on being a slow writer.